
The FPG Property Fund Head Office in Cape Town was specified with Aertec AAC based on a joint decision between the client and project engineer, driven by the material's structural performance, lighter structural loads, and the faster construction schedule it enables compared to conventional masonry.
For a corporate head office, the specification needed to deliver a high-quality finish consistent with a professional environment, excellent acoustic separation between meeting rooms and open plan areas, and a construction schedule that minimised disruption to the existing site operations.
Aertec AAC met all these requirements, with the lighter blocks enabling a more economical structural design and the thin-bed installation system reducing schedule time without compromising quality.















